EXAPARC
830 MW UNDER DEVELOPMENT
Request capacity →
INITIAL PHASE 830 MWE GROWING TO 958 MWE AND BEYOND
AI compute campus · Anglesey, Wales

830 MWe
CRITICAL IT LOAD

A consented 2.5 million sq ft compute campus on Anglesey, inside the Freeport and the North Wales AI Growth Zone. A 958 MWe power programme — a signed 210 MWe firm grid tie-in stepping to 390 MWe, an 18 MWe distribution tie-in, and 550 MWe of on-site generation — with sub-5 ms dark fibre to Dublin, Manchester and Cardiff.

Request capacity
  • 210 MWe contracted, plus 180 MWe under the Modification Application — 390 MWe in total
  • A confirmed path to 1,000 MWt of gas across the campuses by 2029, and more beyond
  • 2.5 million sq ft consented under OP/2025/2
  • All land within the Anglesey Freeport and the North Wales AI Growth Zone
  • Subsea cable and dark fibre terminating immediately adjacent to the campus
958MWe
power programme
Dragon North 518 · Rhosgoch 440
830MWe*
critical IT load
at full build · * assuming baseline PUE
2.5m sq ft
consented
OP/2025/2 · IACC · 9 Sep 2025
59MWe
first power · target
2027 Q3 · ahead of grid
02 · Power

958 MWe. Quarter by quarter.

Capacity arrives in steps, each one already contracted, confirmed or costed. On-site generation carries the platform from 2027, ahead of the grid tie-in energising in 2028.

Capacity available · cumulative MWe
0
2027 Q3
+59 MWe
Confirmed + option
0
2027 Q4
+179 MWe
Confirmed
0
2028 Q1
+210 MWe
Contracted
0
2029 Q3
+330 MWe
Costed
0
2030 Q3
+180 MWe
Under application

Labels are read strictly: contracted, confirmed, costed or under application. Quarters aggregate every step landing in that quarter.

The programme
01 · GRID
Grid tie-in
390MWe
210 MWe contracted

A signed bilateral embedded generation agreement at 210 MWe firm, stepping to 390 MWe under the Modification Application.

02 · ON-SITE
On-site generation
550MWe
220 confirmed · 330 costed

A confirmed path to 1,000 MWt across the campuses by 2029, and more beyond. This is what carries the platform ahead of the grid.

03 · DISTRIBUTION
Distribution tie-in
18MWe
Option

A separate substation through the distribution network — the earliest power available on the platform.

Further growth potential · offered, none contracted
TidalA consented tidal zone west of the campus, offered on a private wire.
SolarA promoted solar and storage scheme adjacent to Rhosgoch, offered on a private wire.
SMR nuclearContracted small modular reactor deployment north-west of Rhosgoch, output offered on a private wire.
03 · Deployment classes

Six bands. One pennant.

Capacity is offered in standard bands rather than by bespoke quote. Each deployment carries a pennant — C-01 is the first Cruiser — and that identifier follows it through commissioning, the operations console and every invoice. Halls are built in 10 MW blocks against 15-year leases.

KCorvette
1–5 MW
ProfilePilot / research

Shared hall. The smallest band offered, and the shortest path to first compute.

FFrigate
5–10 MW
ProfileScale-up

A single 10 MW block. The unit the build programme is sequenced around.

DDestroyer
10–25 MW
ProfileProduction inference

Multiple blocks within one thermal zone, commissioned and handed over together.

CCruiser
25–50 MW
ProfileFrontier training

Half a hall, liquid to the rack, with the fabric specified against the tenant's workload.

RCarrier
50–100 MW
ProfileHyperscaler anchor

A dedicated hall with its own power allocation. Anchor-tenant terms.

SGStrike Group
100 MW+
ProfileMulti-campus

Capacity federated across campuses under a single offtake. Sovereign and frontier-lab scale.

04 · Commissioning

8 months from signature to load.

Every campus runs the same six-gate commissioning programme, witnessed and evidenced at each stage, from signature to handover and into service. You see the same rail we do.

01
Tenanted
1 mo · M0–M1
Lease signed, deposit received
02
Permitted
1 mo · M1–M2
Consents and connections
03
Built
3 mo · M2–M5
Shell, fit-out, fabric
04
Energised
1 mo · M5–M6
Tie-in, first power
05
Burn-in
1 mo · M6–M7
Load bank, thermal soak
06
Handover
1 mo · M7–M8
Acceptance, keys to tenant
Live rail · three campuses
Dragon North expanded · 3 units in commissioning
F01Frigate 01 · 10 MW
01TenantedSite
02PermittedPerm
03BuiltBilt
04EnergisedEnrg
05Burn-inBurn
06HandoverHand
07LiveLive
C01Cruiser 01 · 40 MW
01TenantedSite
02PermittedPerm
03BuiltBilt
04EnergisedEnrg
05Burn-inBurn
06HandoverHand
07LiveLive
F02Frigate 02 · 9 MW
01TenantedSite
02PermittedPerm
03BuiltBilt
04EnergisedEnrg
05Burn-inBurn
06HandoverHand
07LiveLive
05 · Network

Dublin in 1.8 ms.

Dark subsea and carrier fibre terminates adjacent to the campus — the nearest existing subsea infrastructure is 0.8 km away. Primary and diverse routes reach Equinix MA5, Interxion/DLR and VDC CWL-1 at sub-5 ms round trip, with onward paths to the United States and mainland Europe.

Dublin1.80 ms · 180.0 kmManchester2.44 ms · 244.8 kmCardiff4.20 ms · 402.0 kmLondonUK interconnect hub← UNITED STATESTransatlantic subseaMAINLAND EUROPE →via BudeDragon NorthDGN-01 · ANGLESEY, WALES
CARRIERS · COLT (INCL. LUMEN) · ZAYO · EUNETWORKS · EXA INFRA · SSE/NEOS · KPNSUBSEA · CELTIXCONNECT-1 & 2 · EMERALD BRIDGE · ROCKABILL · 0.8 KM FROM CAMPUS
Round-trip · from Dragon North
DublinInterxion / DLR1.80 ms
ManchesterEquinix MA52.44 ms
CardiffVDC CWL-14.20 ms
LondonUK interconnect hubonward
Primary + diverse route per endpoint
<250 km AI/HPC optical tolerance · 4 entrance vaults ≥200 m apart
06 · Portfolio

Three campuses, one platform.

Campus detail →
DGN-01
Dragon North
Holyhead · Anglesey, Wales
CONSTRUCTION
518MWe
First power 2027 Q3
GRID · ON-SITE · DISTRIBUTION

Tidal and further generation offered on private wire.

DGS-02
Dragon South
Holyhead · Anglesey, Wales
PERMITTING
TBA
Capacity to be announced
ADJOINS DGN-01

Held under option, exercised at completion. Sizing in progress.

RSG-03
Rhosgoch
North Anglesey, Wales
PERMITTING
440MWe
First power 2027 Q4
ON-SITE GENERATION

Solar and SMR nuclear offered on private wire; gas sourceable well beyond the initial build.